Holford Gas Storage, ESD
|
Application: Emergency Shutdown Panels (ESD)
Installation Area: Holford, Cheshire, UK
Client: Jacobs Engineering
Contract Value: £78k
Jacobs Engineering UK Ltd, awarded Hima-Sella Ltd the contract for the supply of eight Emergency Shutdown Panels (ESD), for installation in the Drakelow Borehole areas of the Brine & Water Infrastructure aspect of the Holford Gas Storage Project.
Designed to communicate with a Delta V control system, the shutdown systems incorporate the HIMA F35 HIMatrix PES for use in upto and including SIL 3 applications. Due to the temperature specifications, thermostats and anti-condensation heaters were also included. The systems (Input Terminal to Output Terminal) supplied comply with the requirements of IEC61508 - SIL2.
The underground caverns and gas plant infrastructure should take 4 years to complete, from start to finish, with the first phase expected to be operational from 2008. The remaining capacity is expected to come online during 2009 and 2010.
Please call our Sales Dept on 0161 429 4500 or send an email to sales@hima-sella.co.uk if you require more technical information, such as data sheets, or to discuss any application you may be considering.
Your safety... our future
|
Related Pages
Oil & Gas Industry Case Studies
|
|
|
|
|
|
|
|
|
|
|
|
|