|
This website uses anonymous cookies to help us analyse visitor statistics. By continuing to view this website you consent to this use.
You can learn more about cookies and our cookie policy in our Privacy & Cookie Statement.
[Dismiss this banner]
|
|
|
Maersk D & E - ESD and F&G
|
Application: Emergency Shutdown and Fire & Gas Detection Systems
Installation Area: Al-Shaheen Platforms -Offshore Qatar
Client: Maersk
Hima-Sella provided Emergency Shutdown and Fire & Gas Detection Systems for the location D and E Offshore Platform Projects for Maersk, Qatar.
Utilising HIMA HIQuad H51q-HS, we provided a tailor made solution, certified to Safety Integrity Level (SIL) 2 at IEC 61508. The main operator interfaces to the ESD/F&G system were provided by dual PC based HMI stations running Intellution iFix SCADA software via an Ethernet link. In this instance, Maersk specified the required integrity level for the Programmable Electronic System (PES) as SIL3. Operator controls and interfaces at the F&G/ESD panel are provided via front of panel mounted indicators and pushbuttons. The system I/O is configured as simplex (single channel).
Please call our Sales Dept on 0161 429 4500 or send an email to sales@hima-sella.co.uk if you require more technical information, such as data sheets, or to discuss any application you may be considering. Download Hima-Sella's safety systems brochure here.
|
Related Pages
Oil & Gas Projects
|
|
|
|
|
|
|
|
|
|
|
|
|